Skip to main content
Join talent pool
TrebaLet’s talk
Managed Operations

Managed BIM modelling and coordination support

Managed Building Information Modelling (BIM) and coordination support gives UK architectural practices, multidisciplinary engineering consultancies and construction contractors structured 3D model production and documentation capacity in Kenya.

A professional marks up technical drawings beside a tablet
A professional explains information to two colleagues at an office workstation
Is this right for you?

Who this service suits

Your UK design or construction team needs additional 3D modelling capacity across RIBA or project work stages.

  • You need geometry, parametric families, drawing sheets or clash reports.
  • You have an established BIM Execution Plan, shared parameter templates and a Common Data Environment (CDE).
  • Your BIM manager, coordinator or lead engineer sets modelling standards and reviews federated models.
The work we handle

Included work

Subject to requirements assessment and written scope agreement, the managed workflow can cover 3D parametric model authoring and Revit family creation. Under the same conditions, it can cover sheet extraction from coordinated models and automated clash-detection reporting at your specified Level of Development (LOD).

Model authoring and updates

Task: Create or update BIM elements from supplied designs or point clouds in accordance with your BEP and target LOD.

Output: Work-in-progress native models and IFC exports follow your model structure and coordinates for coordinator review.

Parametric families and libraries

Task: Build parametric families from manufacturer data, dimensional schedules and shared parameters, avoiding unnecessary model detail.

Output: Tested family files contain agreed geometry, connectors and metadata, ready for approval into your content library.

Clash detection and reporting

Task: Run clash tests using agreed tolerances, group related intersections, and capture viewpoints for coordination issues.

Output: The clash report and issue schedule identify unresolved clashes for your BIM coordinator or lead engineer’s adjudication.

Model sheets and schedules

Task: Extract sheets and schedules from the approved model, apply view templates and annotations, and incorporate coordinator revisions.

Output: Draft sheets and schedules enter your work-in-progress folder awaiting formal checks and suitability sign-off.

Clear responsibilities

Responsibilities and approvals

Every Managed Operations engagement uses a written agreement identifying the scope, exclusions, responsibilities, approval thresholds and escalation procedures.

Treba

  1. Recruits, organises and supervises the Kenya-based BIM modelling team assigned to your project scope.
  2. Allocates modelling packages, family creation and sheet extraction tasks across the agreed project milestones.
  3. Checks draft deliverables against your BIM Execution Plan’s naming conventions, parameters, worksets and model-health requirements.
  4. Logs design or coordination queries for your decision, with the agreed progress and model-health reports.

Your business

  1. Provides the BIM Execution Plan, project templates, shared parameters, coordinate systems and agreed design inputs.
  2. Confirms software licensing arrangements, common data environment permissions and the agreed model-exchange protocols.
  3. Assigns qualified architects and engineers to decide design, engineering and coordination questions, including clashes and assumptions.
  4. Verifies technical and regulatory compliance, retaining professional sign-off and approving models and sheets before formal issue.
Quality and reporting

Quality and reporting

Agree handoff-stage model checks with your BIM lead before modelling.

Quality checks

Agreed checks can review draft models for BEP names, worksets, shared coordinates, parameter completeness and model-health warnings before the proposed CDE handoff stage.

Reporting

Agreed reporting can cover completed zones or systems, delivered families, coordination queries awaiting engineer resolution and results from the agreed model-audit checklist.

Review and escalation

Agree milestones and cadence per project or workflow. Models remain work in progress; your authorised project lead retains suitability approval and shared-state CDE publication.

An MEP coordination update is being prepared. An agreed check can review ductwork worksets and parameters against the schedule template. Unresolved structural penetrations are flagged in a clash report for your lead engineer’s decision.
Working together

Systems, access and security

Systems in scope

Assess BIM authoring, coordination and cloud tools, including Revit, Navisworks, Autodesk Construction Cloud (ACC), BIMcollab or Archicad, for familiarity, version matching and licensing. Named software or ISO 19650 workflows identify requirements to assess; no vendor accreditation is implied.

Permissions and ownership

You own project models, family libraries and CDE accounts. Role-based folder permissions restrict team access to authorised work-in-progress areas within your project’s common data environment.

Data handling and safeguards

Security controls are agreed per client for their requirements. Treba holds Cyber Essentials and is registered with Kenya's Office of the Data Protection Commissioner (ODPC).

Read about security and data handling
Getting started

Getting started

Begin with a technical BEP, discipline and deliverable standards review. Requirements and launch timelines are agreed per client.

  1. BEP and requirements review

    Share disciplines, target LOD, authoring software versions, CDE setup, sample model standards and expected package volumes for review against your BEP.

  2. Written scope and proposal

    Treba assesses feasibility and provides a scoped written quote covering modelling and coordination tasks, exclusions, software/licensing arrangements, audit checks and pricing.

  3. CDE setup and pilot package

    After signing, both teams configure CDE permissions, project templates, coordinate benchmarks and query logs to prepare the agreed modelling and coordination workflow.

  4. Coordination and reviews

    Treba supervises ongoing modelling packages and joins agreed coordination reviews with your UK BIM manager or project engineer.

Pilot duration, notice and replacement terms are agreed per client. For any agreed pilot zone or sample package, your BIM lead reviews BEP compliance before scaling.

Fees and terms

Pricing and terms

Your written quote reflects the technical and operational scope of your BIM workflow.

  • Discipline complexity, target LOD and 2D drawing/point-cloud input quality.
  • Model volume, sheet extraction and revision frequency across project stages.
  • Software licensing, cloud worksharing setup and UK overlap hours.
  • Model-audit checklist depth and reporting cadence.

The proposal identifies inclusions, Treba’s fees and separate charges, including specialist software or cloud collaboration licences where applicable. Material changes to scope, LOD or discipline coverage are reviewed and agreed in writing.

Discuss your needs
Practical answers

Frequently asked questions

Does Treba take design responsibility or sign off issued BIM models?

No. Architectural, structural, MEP and regulatory sign-off stays with your qualified UK design professionals. Treba authors and updates draft 3D models, families and extracted sheets strictly to your BEP and engineer instructions, leaving formal suitability approval with your team.

Can the team work within our ISO 19650 and Common Data Environment workflows?

Your practice may operate an ISO 19650-aligned information management process and a CDE such as Autodesk Construction Cloud. If so, share your BIM Execution Plan, naming standards and folder states during scoping. This lets us align our internal check procedures with your work-in-progress handoff rules.

How do you handle clash resolution between structural and MEP models?

Where clash detection is included in scope, the team runs the agreed clash rules, filters out duplicate or within-tolerance items, and compiles a visual issue report. Any clash that requires changing design sizes, structural openings or routing strategy is escalated to your lead engineer for instruction before the model is modified.

How are Revit or BIM software licences provided?

Software versions, cloud worksharing seats and licensing responsibilities are reviewed during scoping and explicitly documented in your written proposal. Both sides then know which licences your business provisions and what is agreed separately.

How does BIM modelling differ from CAD Drafting, and when should we hire a BIM Modeler instead?

BIM modelling focuses on 3D parametric authoring, data-rich families, clash reporting and coordinated sheet extraction, whereas CAD Drafting covers 2D drawing production and mark-up updates. Choose Managed Operations when you want Treba to supervise package allocation, BEP checks and progress reporting. Choose Hire Talent + EOR when your own BIM manager wants to direct an individual modeller day to day.

Two blue lounge chairs beside a blue wall
WORK WITH TREBA

Put your workflow in good hands.

Tell us your tasks, tools and workload.

Tell us about the work

Enquiry and next steps

Loading enquiry form…