Skip to main content
Join talent pool
TrebaLet’s talk

Send to a colleague

Guide4 min read

Kenya vs India vs Philippines: a UK outsourcing comparison

Compare Kenya, India and Philippines outsourcing proposals on working hours, total cost, role-specific skills, security evidence and a representative pilot.

Kenya vs India vs Philippines: a UK outsourcing comparison

Key takeaways

1

For local 09:00–17:00 schedules, UK overlap varies substantially by location and season.

2

Request the same scope, seniority, volume and cost period from each provider.

3

Score evidence from the proposed people and systems rather than assigning country-wide quality rankings.

4

Apply mandatory requirements before weighted scores, then validate the shortlist with representative work.

01.Compare providers against one UK workflow brief

Create a common brief covering tasks, monthly volumes, complexity, systems, required decisions and client review. Send it to each provider unchanged. Record assumptions and unanswered questions separately so a low quote is not rewarded for omitting work.

Set mandatory requirements before scoring: permitted data location and access, required credentials, essential service hours, security controls and workable contract terms. A proposal that fails a mandatory requirement needs resolution before a weighted score can be meaningful.

02.Compare total cost and contract assumptions

Choose one monthly or annual basis. List the provider fee, onboarding, tools, client review, cover, variable volumes, currency terms and exit. For a dedicated hire, compare seniority and hours; for managed delivery, compare the unit, quality threshold and exclusions.

Use the actual quote for each provider. Country salary averages mix roles, regions and employment models and cannot predict a delivered price. Ask who carries the cost of rework, demand spikes and delays waiting for client approval.

03.Calculate the actual working-hour overlap

Illustrative schedule: assume 09:00–17:00 local working hours for each provider and 09:00–17:00 for the UK client, with no breaks deducted. The table converts each delivery day into UK time.

LocationUTC offsetUK schedule during GMTUK schedule during BSTShared hours: GMT / BST
Nairobi, Kenya+306:00–14:0007:00–15:005 / 6
India+5:3003:30–11:3004:30–12:302.5 / 3.5
Philippines+801:00–09:0002:00–10:000 / 1

These are clock calculations for the stated schedules, not restrictions on available service hours. Providers may offer different shifts. Ask for the proposed rota, holiday calendar, premium costs and live escalation coverage, then test meetings and handovers in UK time.

Specify which work needs professional authorisation, local presence or client approval. Check the proposed person’s credentials and experience against the actual UK workflow. Similar terminology, a common-law background or a qualification name does not establish authority for a particular task.

Agree who instructs the team, who reviews work and who signs off decisions. Obtain advice on the proposed employment, contractual and tax arrangement rather than treating any country as automatically simpler.

05.Test communication and role-specific skills

Use the same anonymised task, instructions and scoring for each shortlisted team. Test a routine case, an ambiguous case and an escalation. Include a feedback round to see whether the person can understand and apply a correction.

For customer work, assess written or spoken communication on the actual channel. For technical work, review the reasoning and reproducibility. Record reviewer effort as well as completion speed; nationality does not establish either capability or fit.

06.Review data protection and control evidence

Map entities, processing roles, systems, remote access, subcontractors and delivery locations for every proposal. Ask the client privacy and security owners to confirm the required contractual and transfer arrangements. Check certificate status and scope for the actual entity, sites and services.

Use a permissioned demonstration of access approval, logging, revocation and incident escalation. Compare evidenced controls and unresolved gaps. A country-level data-protection law or a provider logo is not a substitute for the proposed control design.

07.Check infrastructure, staffing and continuity

Ask what happens if the site, connection, key team member or primary software is unavailable. Review backup arrangements, recovery-test evidence, staffing cover and the route for urgent client decisions.

If you split work across suppliers, check shared dependencies and handoff costs. A second location may still depend on the same identity platform or client approver. Define who coordinates recovery and how work records remain accessible.

08.Use a scored shortlist and a representative pilot

Illustrative scoring: after mandatory checks pass, allocate 30% to work-sample quality, 25% to schedule and escalation fit, 20% to control evidence, 15% to total cost and 10% to continuity. Choose your own weights before seeing the results.

If a hypothetical proposal scores 4, 5, 3, 4 and 3 out of 5 respectively, the weighted score is 3.95 out of 5: (4 × 0.30) + (5 × 0.25) + (3 × 0.20) + (4 × 0.15) + (3 × 0.10). This is a scoring example, not a ranking of countries or providers.

Pilot a representative piece of work and compare accepted output, corrections, client review time, escalation and total cost. Keep evidence and unresolved conditions alongside the score. Select the arrangement that meets the workflow’s requirements, then agree expansion and exit conditions.

09.Sources checked 17 November 2026

GOV.UK: UK clock changes — UK GMT/BST seasonality used in the illustrative local-schedule comparison.

Questions

Frequently asked questions

Which destination is cheapest?

A useful answer needs matched quotes for the same role, seniority, scope and schedule. Compare the provider fee and retained client costs, including tools, review, cover and exit.

Can an India- or Philippines-based team cover UK hours?

Yes, where the proposed shift provides that coverage. The example uses local 09:00–17:00 schedules only; obtain the actual rota, availability and costs before comparing.

Can I use more than one location?

Yes, but include coordination, shared dependencies, access controls and recovery ownership in the comparison. Test the handover and continuity arrangements before relying on them.

Nairobi balconies and green leaves beside an open blue sky
WORK WITH TREBA

Find the right support for your team.

Tell us the work your team needs help with.